Level 1 - Introduction to Lean Manufacturing
Principles:
We
developed this kit for organizations with little
or no knowledge of
Lean Manufacturing
Principles. The Level 1 kit takes a team of employees through a single product assembly line simulation using
Lego™ blocks to create the finished items. Your team of
employees is taken through 4 stages of process improvement. They
quickly learn how working together as a team is important when identifying and
implementing process improvements, and they experience this in
real-time. They see how their decisions directly impact the entire
manufacturing process, starting from the procurement of raw materials to shipping
the finished products to the customer.
Total
time required to complete this simulation is approximately 1 hour
and it requires a minimum of 7 people in attendance to successfully
run the Level 1 simulation.
Level
1: Introduction to Lean Manufacturing Simulation Kit consists of:
-
A training CD which includes; training manual,
process paperwork and assembly drawings and a profit and loss
spreadsheet.
-
A Lego™ kit.
-
Tool box which includes; stop watches, measuring
equipment, clip board, pens and note pad.
-
Rolling tote bag with pull handle to hold all
items for easy storage and transportation.
You can
now purchase our Level
1: Introduction to Lean Manufacturing Simulation Kit at a
price of $950 (plus shipping & handling).
To
order
your
Level
1: Introduction to Lean Manufacturing Simulation Kit, please call David Jones at
(916) 353-1243
(between 8:00 am to 6:00 pm PST). Use this product code LMC-001
when ordering this kit.
|